We successfully completed the Server and IT Infrastructure Relocation project for Dextra, ensuring a clean, organized, and efficient setup at the new location.
The tasks completed include:
Server Relocation and Optimization:
- Relocated the servers to the new site with proper handling to ensure system integrity.
- Performed a server cleanup, removing unnecessary software, add-ons, and outdated configurations to improve performance and security.
Server Rack Relocation and Organization:
- Relocated and reassembled the server rack, ensuring all components were securely installed.
- Decommissioned and packed all unwanted or obsolete items from the previous setup.
- Wiped clean old hard drives (HDDs) as part of secure data handling.
Network and Access Point Setup:
- Reconfigured and set up the network infrastructure, including LAN connections and switches.
- Installed and configured new Access Points (APs) to provide reliable wireless connectivity across the new office space.
Desktop and Peripherals Relocation:
- Relocated all computers and peripherals, ensuring all systems were reconnected and fully operational at the new site.
- Conducted testing to confirm proper functionality and network connectivity for all relocated devices.
This project provided Dextra with a clean, optimized, and fully operational IT environment in their new location, ensuring seamless business continuity and improved system performance.